310-606-2222
Remodeled Los Angeles bathroom by Precise Building and Restoration
Licensed Los Angeles Design-Build Contractor

Bathroom Remodeling in Los Angeles

Design, permits and construction from one licensed team. See your new bathroom in three free CAD designs before anything is torn out, and get a line-item price before you sign.

  • 5.0 from 36 Google reviews
  • CSLB License #1113493
  • 230+ bathrooms remodeled
  • 35 years in construction

3 Free CAD Designs

Compare layouts on screen before you commit to one.

Permits in Our Name

We file with LADBS, your city or LA County and meet every inspector.

Licensed, Bonded, Insured

CSLB #1113493 with a contractor's bond and workers' comp.

One Team, Start to Finish

The people who design it are the people who build it.

Written Warranty

Workmanship coverage spelled out in your contract.

Overview

Bathroom Remodeling in Los Angeles, Explained Up Front

A mid-range Los Angeles bathroom remodel costs $18,000–$35,000 and takes 3 to 5 weeks of construction once the permit is issued. Plan on 6 to 9 weeks from the first design meeting to a finished room. Almost any work that touches plumbing, electrical, waterproofing or the layout needs a permit from LADBS or your city, and we handle it.

Precise Building and Restoration has remodeled more than 230 bathrooms across Los Angeles, from powder rooms and hall baths to primary suites with steam showers and freestanding tubs. Every project runs the same way: we measure and inspect the room, show you three CAD layouts, price the job line by line, pull the permits, build it with our own project management, and hand you the permit and inspection records at the end.

  • Design consultation and 3 free CAD layouts
  • Protected, contained demolition and daily haul-away
  • Licensed plumbing, electrical and ventilation work
  • Inspected shower waterproofing before tile
  • Vanity, fixtures, tile and tempered glass installed
  • Permits, inspections and final sign-off
Completed Los Angeles bathroom remodel by Precise Building and Restoration
230+bathrooms remodeled in LA
5.0 ★average on 36 Google reviews
1

Waterproofing inspected before tile

Every shower gets a continuous membrane, either a liquid-applied system or a traditional hot-mop pan. Rough plumbing, electrical and waterproofing are inspected before anything is covered, so the layer protecting your subfloor is checked, not assumed.

2

Plumbing decided at design

Keeping the toilet, shower drain and vanity lines where they are keeps a remodel in the mid-range tier. Moving them adds plumbing work, inspections and weeks, so we settle it in your CAD designs, before a tile comes off the wall.

3

California code in every fixture

Showerheads are capped at 1.8 gallons per minute, bathroom faucets at 1.2 and toilets at 1.28 gallons per flush, and exhaust fans need humidity control. We specify fixtures that pass final inspection the first time.

A glance at our work

Our Latest Bathroom Remodeling Projects

Real bathrooms we completed, with the full scope, timeline and result for each one. Click any project to see what was built.

Luxury Primary Bathroom Remodeling — Los Angeles

Spacious primary bathroom suite · Approx. 8–12 weeks

Floating double vanity, vessel sinks, freestanding soaking tub and floor-to-ceiling tile with warm wood details.

Property Type
Luxury single-family residence
Bathroom Type
Spacious primary bathroom suite
Project Scope
Complete bathroom renovation, custom floating double vanity, oversized wall mirrors, vessel sinks, stone countertops, freestanding soaking tub, floor-to-ceiling tile, architectural wood detailing, decorative pendant lighting, under-vanity lighting, updated plumbing fixtures, flooring, and premium interior finishes
Timeline
Approximately 8–12 weeks
Final Outcome
This primary bathroom was transformed into a warm, spa-inspired retreat with a sophisticated resort atmosphere. The custom double vanity, freestanding soaking tub, layered lighting, and natural wood finishes create a luxurious yet inviting space. A thoughtfully designed connection to the primary bedroom establishes a seamless, private wellness suite suited to an upscale Los Angeles home.

Contemporary Primary Bathroom Remodeling — Los Angeles

Contemporary primary bathroom suite · Approx. 8–12 weeks

Wall-mounted double vanity, freestanding tub with floor-mounted filler, textured tile and wood-look floors.

Property Type
Luxury single-family residence
Bathroom Type
Contemporary primary bathroom suite
Project Scope
Complete bathroom renovation, wall-mounted double vanity, integrated sinks, oversized mirrors, freestanding soaking tub, floor-mounted tub filler with hand shower, textured wall tile, wood-look flooring, modern pendant lighting, updated plumbing, custom electrical work, and expansive windows for natural light
Timeline
Approximately 8–12 weeks
Final Outcome
This primary bathroom was transformed into a bright, contemporary wellness retreat. The floating double vanity creates a clean, spacious appearance, while the freestanding tub serves as the room’s focal point. Textured gray surfaces, warm wood tones, polished fixtures, and abundant natural light deliver a refined balance of luxury, comfort, and modern Los Angeles style.

Luxury Marble Bathroom Remodeling — Los Angeles

VIP guest bathroom · Approx. 8–12 weeks

Oversized walk-in shower with frameless glass, marble-look tile, a custom wood vanity and brushed-gold fixtures.

Property Type
Luxury single-family residence
Bathroom Type
VIP guest bathroom
Project Scope
Complete bathroom renovation, oversized walk-in shower, custom frameless glass enclosure, marble-look wall and floor tile, mosaic shower floor, recessed storage niche, rainfall showerhead, handheld shower system, custom wood vanity, stone countertop, sculptural vessel sink, wall-mounted faucet, decorative mirror, statement lighting, and coordinated brushed-gold fixtures
Timeline
Approximately 8–12 weeks
Final Outcome
This bathroom was transformed into a polished, hotel-inspired retreat defined by luminous marble surfaces and elegant gold accents. The spacious glass-enclosed shower creates an open atmosphere, while the dark wood vanity and black floor borders add warmth, contrast, and architectural definition. Sculptural fixtures and carefully layered lighting complete the sophisticated Los Angeles design.

Modern Spa Bathroom Remodeling — Los Angeles

Primary bathroom suite · Approx. 8–12 weeks

Large walk-in shower with rainfall and handheld systems, large-format stone-look tile and a full-width mirror.

Property Type
Luxury single-family residence
Bathroom Type
Primary bathroom suite
Project Scope
Complete bathroom renovation, oversized walk-in shower, frameless glass enclosure, rainfall and handheld shower systems, large-format stone-look tile, custom double vanity, integrated sinks, stone countertops, full-width mirror, wall-mounted lighting, recessed ceiling lights, built-in open storage, updated plumbing, and premium interior finishes
Timeline
Approximately 8–12 weeks
Final Outcome
This primary bathroom was transformed into a bright, hotel-inspired sanctuary with an open layout and refined neutral palette. The expansive glass shower and mirrored vanity enhance the sense of space, while layered lighting and large-format surfaces create a calm, luxurious atmosphere. Thoughtful storage and dual sinks provide the everyday functionality expected in an upscale Los Angeles home.

Before & After: Contemporary Primary Bathroom — Los Angeles

Contemporary primary bathroom suite · Approx. 8–12 weeks

A dated primary bath rebuilt around a freestanding tub, a floating double vanity, large-format charcoal tile, a skylight and a frameless glass partition.

Property Type
Luxury single-family residence
Bathroom Type
Contemporary primary bathroom suite
Project Scope
Complete bathroom renovation, freestanding soaking tub, floor-mounted tub filler, floating double vanity, marble countertop, integrated rectangular sinks, wall-mounted faucets, full-height mirror, large-format charcoal tile, frameless glass partition, concealed toilet area, skylight, recessed lighting, under-vanity illumination, updated plumbing, and premium interior finishes
Timeline
Approximately 8–12 weeks
Final Outcome
This primary bathroom was transformed into a sophisticated contemporary retreat with a dramatic charcoal palette and clean architectural lines. The freestanding tub creates an elegant focal point, while the floating double vanity and expansive mirror make the room feel open and refined. Natural light from the skylight, layered illumination, and crisp white fixtures bring balance and warmth to this luxurious Los Angeles bathroom.

More completed bathroom projects

How it works

Our Bathroom Remodeling Process

Eight steps in three phases. You always know what happens next, who is doing it and what you will have at the end of each step.

Phase 1About 1–2 weeks

Plan & Design

We learn how you use the room, find the problems behind the walls, and settle the layout before any work starts.

  1. 1

    Initial Consultation

    We talk through your current bathroom, how you use it, your style, priorities, budget range and timing, and note problems such as poor ventilation, cracked tile, low water pressure or a cramped layout.

    Outcome: A shared list of goals, priorities and a realistic budget range.
  2. 2

    Site Evaluation and Measurements

    We measure the room and check plumbing locations, drain slope, electrical capacity, ventilation and subfloor condition. In homes built before 1980 we also look for asbestos, lead paint and hidden mold before pricing.

    Outcome: Exact measurements and known risks identified before you see a price.
  3. 3

    Design and 3 Free CAD Designs

    Three CAD concepts explore layout options, such as keeping or moving the toilet, converting a tub to a walk-in shower, or adding a second sink, so plumbing decisions are made on paper.

    Outcome: A chosen layout and a defined scope.
Phase 21–2 weeks (express permit)

Price, Permits & Prep

You sign a line-item price, drawings go to LADBS, your city or LA County, and long-lead items are ordered so the crew never waits on a vanity or glass.

  1. 4

    Proposal, Selections and Ordering

    A line-item proposal lists materials, allowances, permit costs, contingency and milestone payments. Long-lead items such as custom vanities, special-order tile and glass are ordered before demolition.

    Outcome: A signed contract with scope, price and schedule in writing.
  2. 5

    Plans and Permits

    We prepare floor plans, plumbing and electrical drawings and Title 24 forms, then file with LADBS, your city or LA County. Same-layout remodels often qualify for an express permit; layout changes go through plan check.

    Outcome: A permit issued and construction scheduled.
Phase 33–5 weeks (mid-range)

Build & Hand-off

Protected demolition, inspected rough work, then tile, fixtures and finishes, ending with final inspection and a walkthrough.

  1. 6

    Demolition and Rough-In (Weeks 1–3)

    Week 1 is protected demolition with daily haul-away. In weeks 2–3, plumbing is relocated, electrical is updated and framing is completed. The inspector checks rough plumbing, electrical and waterproofing before anything is covered.

    Outcome: Rough inspections passed and walls ready to close.
  2. 7

    Tile, Fixtures and Finishes (Weeks 4–5)

    Tile setting, the vanity and countertop, toilet, shower system, glass enclosure, mirrors, lighting and paint, with grout lines and edges done carefully, not rushed.

    Outcome: Your new bathroom fully installed.
  3. 8

    Final Inspection and Walkthrough

    Final inspection, then our own quality check. We test every fixture, fan and outlet with you, and hand over warranty documents and copies of your permit and inspection records.

    Outcome: A signed-off bathroom with the paperwork you need when you sell.
Full gut remodels take 4–6 weeks of construction, luxury spa bathrooms 6–10 weeks, and estate primary suites 8–12 weeks.Week-by-week timeline
Fewer delays, fewer surprises

How We Keep Your Remodel on Schedule and on Budget

Most bathroom budgets are blown by decisions made too late. We move those decisions to the start.

Decisions made on paper

Layout, plumbing locations and fixture sizes are fixed in the CAD designs, so nothing gets redesigned with the walls open.

Long-lead items ordered first

Custom vanities, special-order tile and shower glass are ordered before demolition, not after the crew is waiting.

Permits filed in our name

We prepare the drawings, file them, schedule each inspection and meet the inspector on site.

One point of contact

One project manager answers your questions from the first visit to the final walkthrough.

See your new bathroom before demolition starts

Book a free site visit. We measure the room, talk through your budget and prepare three CAD layouts you can compare side by side.

Customer reviews

Bathroom Remodeling Reviews

What Los Angeles homeowners wrote on Google after their bathroom remodels. Each review links to the original.

5.0
Average of 36 Google reviews · Read them all
The contractor, Tony, was great with my elderly dad, for whom he was doing a complete bathroom rebuild and some other safety-related projects… his workers were also very patient and respectful.
Crystal R. · Complete bathroom rebuild · Google review, November 2025
★★★★★May 2026

“I highly recommend working with Tony and George at Precise Builders. I honestly couldn’t be happier with how my two custom bathrooms turned out! From the beginning, Tony was super communicative, easy to work with, and really listened to what I wanted (even though I know I can be pretty picky and difficult sometimes). And somehow the team managed to bring my vision to life exactly the way I hoped.The crew he brought was amazing too - all incredibly polite, respectful, hardworking guys who clearly cared about doing quality work. You could tell they took real pride in every detail, and everything was done with so much precision and care. It’s rare to find people this reliable, skilled, and genuinely pleasant to work with. The whole experience was smooth from start to finish, and I’d 100% work with them again. Highly recommend!!”

CommunicationAttention to DetailRespectful Crew
Dalieh Q.Two custom bathrooms
Google
★★★★★August 2025

“We recently remodeled our bathroom with them, and are very happy with the results (before and after pictures attached), both wrt the looks and very reasonable prices. We handled plumbing changes with our own plumber, and I bought all visible outfits (tile, tub, faucets, vanities, mirrors) myself — they provided demo & haul, built back the shower, tiling, installation of the new vanities and shower door, and also handled the finish and paint . Excellent arrangement for greater control of the budget and timing. Precise Building was our choice precisely for that reason (and the 3-4 week timeline). So, at a reasonable price, the team was able to accommodate a tight schedule, and the workers sent to the house were prompt, responsive, and very attentive to detail (Adalberto and Brandon are superstars in my book 😌). As all remodels, it didn’t go without challenges, but the Precise Building manager Tony and the job manager George personally responded to them in a timely way, making the process and outcome much better than expected. I would definitely recommend & hire them again!”

3-4 Week TimelineReasonable PriceOwner-Supplied Fixtures
Graciela G.Bathroom remodel
Google
★★★★★October 2025

“Tony and his team were awesome. They recently completed a bathroom remodel project which took some twists and turns due to issues with the previous construction. Tony was great at explaining the issues and how they would be handled, and the team executed flawlessly. Thanks again, will give PB&R a call for future projects and recommend highly.”

Problem SolvingClear Explanations
Luke H.Bathroom remodel
Google
★★★★★November 2025

“The contractor, Tony, was great with my elderly dad, for whom he was doing a complete bathroom rebuild and some other safety-related projects. Many service professionals don't have the knack for working with much older clients because it requires extra patience but I was impressed with Tony. And then that kind of thing trickles down from the top, so his workers were also very patient and respectful, even when my father would have trouble explaining what he wanted or would go off on tangents. If you are older and concerned about being rushed or disrespected by a contractor, or if you're helping an elderly family member secure this kind of work, I definitely recommend Tony.”

Safety UpgradesPatient Crew
Crystal R.Complete bathroom rebuild
Google
★★★★★January 2026

“We had our bathroom and kitchen redone and couldn’t be happier with the results. The work came out great, and the whole process was smooth from start to finish. George was very friendly, patient, and always took the time to answer our questions. Big thanks to George and the team—we’d definitely recommend this company in the future!”

Smooth ProcessResponsive
Michael J.Bathroom and kitchen remodel
Google
★★★★★August 2026

“Really happy with the work from Precise Building and Restoration. They did a great job remodeling our kitchen and bathroom. They updated the kitchen with new cabinets, countertops, and backsplash, and remodeled the bathroom with new tile, flooring, and fixtures. Everything came out clean and well-finished, and the crew was professional throughout the project. The attention to detail really stood out. Definitely recommend them.”

Tile & FlooringClean Finish
Jose F.Bathroom and kitchen remodel
Google

Also reviewed on Yelp, Angi, Thumbtack and the Better Business Bureau.

Guest bathroom in Los Angeles with marble-look tile, walk-in shower and brushed-gold fixtures
Your new bathroom

Bathrooms We Remodel

From a 40-square-foot powder room to a primary suite, the process is the same. The scope changes, and so does the price.

  • Primary (master) bathroom suites

    Double vanities, walk-in or steam showers, freestanding tubs, private toilet rooms and heated floors.

  • Guest and hall bathrooms

    Durable tile, frameless glass, practical storage and quiet ventilation for a shared bath.

  • Powder rooms

    Wall-hung or vessel sinks, statement tile or wallpaper and sculptural lighting in a small footprint.

  • Walk-in showers and tub-to-shower conversions

    A new drain and valve, a waterproofed pan, built-in niches and a frameless glass enclosure.

  • Safer bathrooms for aging in place

    Curbless entries, grab-bar blocking, comfort-height toilets, slip-resistant tile and lever handles.

  • Pool house and cabana baths

    Slip-resistant surfaces and corrosion-resistant fixtures that hold up to wet traffic and pool chemicals.

Who handles the work

The People Behind Your Bathroom Remodel

You deal with the same small team from the first site visit to the final inspection.

Tony Akopyan

Construction & Remodeling Specialist

Your main contact from the first conversation through the final walkthrough, and the person who explains problems and options when they come up.

George

Job Manager

Runs the schedule, the crew and day-to-day questions once construction starts.

Licensed trades and finish crew

Plumbing, electrical, tile and finish carpentry

Licensed plumbing and electrical work, and tile setters who build the shower pan, waterproofing and finishes.

“Tony was great at explaining the issues and how they would be handled, and the team executed flawlessly.”Luke H., bathroom remodel, Google review
“George was very friendly, patient, and always took the time to answer our questions.”Michael J., bathroom and kitchen remodel, Google review

Precise Building and Restoration on YouTube

Los Angeles project completed by the Precise Building and Restoration team
Why homeowners choose us

Precise Building and Restoration vs. a Typical Remodeler

Use this as a checklist when you compare bids. Ask every contractor how they handle each row.

What to comparePrecise Building and RestorationWhat to watch for elsewhere
Design3 CAD layouts before you commit, free with the site visitA rough sketch, or design is left to you
PriceLine-item proposal with allowances, permit costs and contingencyOne lump-sum number with little detail
PermitsPulled in our name; we schedule and attend inspectionsYou are asked to pull the permit yourself
InsuranceContractor's bond, workers' comp and general liability; certificates sent before workCoverage unclear or not offered in writing
Plumbing changesDecided in design, priced before demolitionDecided once the walls are open
WaterproofingInspected before tile covers itCovered the same day it is installed
Down paymentNever more than $1,000 or 10%, as California law setsLarge deposits before work starts
At hand-offPermit and inspection records plus written warrantyNo paperwork when you sell
2026 pricing

Bathroom Remodeling Cost in Los Angeles

Most Los Angeles bathroom remodels cost $18,000 to $35,000 in 2026. A cosmetic refresh starts around $5,000; luxury spa bathrooms reach $75,000 or more. Add a 10–15% contingency for what demolition uncovers. Our 2026 cost guide breaks the numbers down further.

Cosmetic Refresh

$5,000–$12,000$125–$200 per sq ft · 1–2 weeks
  • Vanity, toilet and faucet swaps
  • Paint, lighting and mirrors
  • Usually no permit
Most common

Mid-Range Remodel

$18,000–$35,000$200–$350 per sq ft · 3–5 weeks
  • New tile, shower and tub
  • Plumbing stays in place
  • Plumbing and electrical permits

Full Gut Remodel

$35,000–$55,000$350–$500 per sq ft · 4–6 weeks
  • Layout and plumbing changes
  • Custom shower and full tile
  • Building and plumbing permits

Luxury Spa Remodel

$55,000–$75,000+$450–$700+ per sq ft · 6–10 weeks
  • Imported tile, heated floors
  • Custom cabinetry, smart fixtures
  • Full permit set

Bathroom Remodel Cost by Package

PackagePrice RangePer Sq FtTimelinePermitTypical Scope
Cosmetic Refresh$5,000–$12,000$125–$2001–2 weeksUsually noFixtures, paint and lighting swaps with no plumbing or layout changes
Mid-Range Remodel$18,000–$35,000$200–$3503–5 weeksYes (plumbing, electrical)New tile, vanity, shower and tub with plumbing in the same location
Full Gut Remodel$35,000–$55,000$350–$5004–6 weeksYes (structural, plumbing)Layout changes, new plumbing runs, a custom shower and full tile
Luxury Spa Remodel$55,000–$75,000+$450–$700+6–10 weeksYes (full permit set)Imported tile, heated floors, custom cabinetry and smart fixtures

Estate primary suites with steam showers, book-matched stone and radiant floors, common in areas like Calabasas, typically run $110,000–$250,000+. See our Calabasas bathroom remodeling page.

What Moves Your Price the Most

Size matters less than you would expect. A 40-square-foot powder room is not automatically cheaper than a 100-square-foot primary bath, because fixtures and finishes drive the budget more than square footage. Labor is typically 40–60% of a Los Angeles bathroom budget.

Moving plumbing

Relocating the toilet, shower drain or vanity lines means new drain runs, venting and extra inspections. It is the single biggest jump between tiers.

Tile and waterproofing

Large-format, natural stone and mosaic tile take more labor per square foot, and a full-height tiled shower needs more membrane and more setting time.

Fixture, vanity and glass package

A custom vanity, thermostatic shower valve and 3/8-inch frameless glass cost several times more than stock equivalents.

Electrical, lighting and ventilation

New circuits for heated floors, lighting layers and a ducted, humidity-controlled fan add electrical and drywall work.

The age of the house

Homes built before 1980 often need asbestos or lead testing, and older pipes and subfloors are more likely to need repair.

Access and logistics

Upstairs bathrooms, hillside lots and tight parking add carrying, protection and haul-away time.

Hidden Costs to Plan For

These are the items demolition most often uncovers in Los Angeles bathrooms. We price the likely ones into your proposal and hold a contingency for the rest.

  • Asbestos or lead paint (homes built before 1980)$1,500–$5,000
  • Mold behind original tile$2,000–$4,000
  • Subfloor repair from slow leaks or dry rot$2,500–$8,000
  • Main sewer line upgrade (cast iron or galvanized)$4,000–$15,000
  • Moving walls or plumbing to a new footprint$8,000–$25,000+
  • Permit fees for a single bathroom$500–$2,000

Pricing reflects planning ranges for typical Los Angeles projects as of November 2026, not quotes. Actual costs vary with site conditions, material lead times, permit requirements, access and any structural or plumbing changes. California requires a written contract for home improvement work over $500 (CSLB).

Get a line-item price for your bathroom

After the site visit you get a written proposal that lists materials, allowances, permit costs, contingency and the payment schedule.

Know before you build

Bathroom Materials and Systems, Explained

The choices that decide whether a bathroom still looks and works right in 15 years. We walk through each one with you during design.

Shower waterproofing

Two proven approaches: a hot-mop pan, a traditional tar-and-felt system common in Southern California, or a liquid-applied or sheet membrane that runs continuously from the floor up the walls. Either one is flood-tested and inspected before tile.

Ask any contractor: which system, and will the inspector see it before tile goes on?

Porcelain vs. natural stone

Porcelain is dense, absorbs very little water and needs no sealing, which makes it the low-maintenance choice for floors and showers. Marble and other natural stone look warmer but etch and stain more easily and need periodic sealing.

Good to know: polished tile on a shower floor gets slippery. Small mosaics or a textured finish give more grip.

Ventilation

Code requires a fan ducted to the outside, and California requires humidity control on most bathroom fans. A common sizing rule is 1 CFM per square foot of floor area for bathrooms up to 100 square feet, with at least 50 CFM.

Why it matters: an undersized or unducted fan is the most common cause of mold on new grout and ceilings.

Vanities

A wall-hung (floating) vanity opens up the floor and is easier to clean under, but it needs solid blocking in the wall. A freestanding vanity holds more storage and is simpler to replace later.

Plan it early: blocking and supply-line heights are set during rough-in, not after drywall.

Shower glass

All shower and tub glass must be tempered safety glass. Frameless enclosures typically use 3/8-inch glass and look cleaner; semi-frameless doors cost less and seal more tightly.

Lead time: glass is measured after tile is set, so it is usually one of the last items installed.

Heated floors and lighting

Electric radiant mats go under the tile and usually need their own circuit and thermostat. New lighting must meet California's high-efficacy rules, and layering vanity, ceiling and shower lights avoids shadows at the mirror.

Budget tip: heating only the main walking area cuts material cost without losing comfort.

Permits

Bathroom Remodeling Permits in Los Angeles

Permits protect your house and its resale value. Here is what needs one, what it costs and how the process works.

Do I need a permit to remodel my bathroom in Los Angeles?

Almost always. Any work that touches plumbing, electrical, waterproofing, ventilation, walls or the layout needs a permit. Only cosmetic swaps, such as a new faucet on existing lines or a vanity replacement with no plumbing changes, are typically exempt.

WorkPermit Required?Permit TypeTypical Fee
Replace a toilet, sink or tub in the same locationYesPlumbing permit$200-$500
Move or add a drain or supply lineYesPlumbing permit$400-$900
Add or move outlets, a fan or lightingYesElectrical permit$200-$600
New shower pan or waterproofing systemYesBuilding permit$300-$700
Layout change or non-load-bearing wall removalYesBuilding and structural$500-$2,000
Tile replacement in the same footprint, no waterproofing changeGenerally no——
Vanity or faucet swap with no plumbing changesNo——

Same-layout remodels with no structural changes can often use an express permit, approved in days. Layout changes, wall removal and structural work go through plan check, which takes longer. Unpermitted bathroom work usually surfaces when you sell or refinance: a buyer's inspector flags it, and the fix can mean opening finished walls and redoing work with permits.

How the LADBS permit process works

  1. Determine the permit type. Same-layout remodels with no structural changes may qualify for an express permit through LADBS's online system. Structural or layout changes go through full plan check.
  2. Prepare the documents. Floor plans drawn to 1/4-inch scale showing the existing and proposed layout, electrical and plumbing plans, and Title 24 energy compliance forms.
  3. Submit to LADBS. Online through LADBS, or in person at a Construction Services Center.
  4. Wait for approval. Express permits take 1–3 days, standard plan check 3–6 weeks, and structural projects 6–12 weeks.
  5. Pass the inspections. Rough framing, plumbing, electrical and waterproofing are inspected before walls are closed, then a final inspection when the work is complete.

Which building department issues my permit?

Your address decides it. Neighborhoods inside the City of Los Angeles, such as Brentwood, Encino, Sherman Oaks, Silver Lake and Studio City, use LADBS. Beverly Hills, Calabasas, Culver City, Santa Monica, West Hollywood and the other separate cities run their own building departments, with their own plan check, fees and inspectors. Altadena and Rolling Hills go through LA County Building and Safety.

We confirm the permitting authority for your parcel at the first site visit, and you get copies of the permit and inspection records at hand-off.

California code rules that shape your new bathroom

Water-efficient fixtures

Showerheads up to 1.8 gallons per minute, bathroom faucets up to 1.2 gallons per minute, and toilets up to 1.28 gallons per flush.

Older homes and old fixtures

In single-family homes built before 1994, a permitted remodel can require replacing noncompliant plumbing fixtures with water-conserving ones before final approval (California Civil Code §1101.4).

Exhaust fans

Fans must be ENERGY STAR rated, ducted to the outside, and controlled by a humidity sensor unless they are part of a whole-house ventilation system.

Lighting

New fixtures must be high-efficacy LED that meets California's JA8 standard, with occupancy or vacancy sensors where required.

Outlets

Bathroom receptacles must be GFCI-protected, which cuts power instantly if current leaks to water or a person.

Shower and tub glass

Glass enclosures must be safety glazing, such as tempered glass, so they break into small, blunt pieces.

Hire with confidence

Verify Before You Hire

Anyone can say "licensed and insured." Here is ours, with the links to check it, and the warning signs to look for in any bid.

Our credentials

Every item can be checked independently.

  • California general contractor, CSLB #1113493. Check the license for status, bond and workers' comp.
  • $25,000 contractor's license bond with Nationwide Mutual Insurance Company, effective July 21, 2026.
  • Workers' compensation through National Liability & Fire Insurance Company, active through September 3, 2027, plus general liability coverage. Certificates naming you are sent before work starts.
  • BBB Accredited Business, a 5.0 rating from 36 Google reviews, and profiles on Yelp, Angi and Thumbtack.
  • Every permit pulled in our name, never yours. Workmanship warranty written into your contract.
  • Office: 500 S Sepulveda Blvd, Suite 408, Los Angeles, CA 90049.

Red flags in any bathroom bid

A trustworthy Los Angeles contractor carries an active CSLB license, pulls permits in their own name, gives you a written scope and can show completed, permitted local work.

  • Asks you, the homeowner, to pull the permit
  • A bid far below every other quote
  • No written contract, or a vague scope of work
  • Cash-only payment
  • A down payment above $1,000 or 10% of the price, whichever is less (the California limit)
  • Cannot show permit history for past jobs
Questions

Bathroom Remodeling FAQs

Straight answers to what Los Angeles homeowners ask us most.

How much does a bathroom remodel cost in Los Angeles?

Most Los Angeles bathroom remodels cost $18,000 to $35,000. A cosmetic refresh with no plumbing changes runs $5,000–$12,000, a full gut remodel with layout changes $35,000–$55,000, and a luxury spa bathroom $55,000–$75,000 or more. Add a 10–15% contingency, especially in homes built before 1980, where demolition can uncover asbestos, mold or subfloor damage.

How long does a bathroom remodel take in Los Angeles?

A mid-range remodel takes 3 to 5 weeks of construction once the permit is issued, and permits usually add 1–2 weeks before work starts. From first design to a finished bathroom, plan on 6 to 9 weeks. Full gut remodels take 4–6 weeks of construction and luxury bathrooms 6–10 weeks; custom stone or special-order tile can add more.

Can I live in my home during a bathroom remodel?

Yes. Most homeowners stay in the house, as long as another bathroom is available. In single-bathroom homes, the critical phase without a working toilet and shower, demolition and rough plumbing, typically lasts 3–5 days, and we schedule it tightly. We seal the work area with plastic barriers and clean up every day.

What is the difference between an express permit and plan check?

An express permit is for straightforward work with no structural changes, such as replacing fixtures in the same location, and can be approved in 1–3 days. Plan check is required when you change the layout, remove walls or alter structure; it takes 3–6 weeks, or 6–12 weeks for structural projects. We determine which path your project needs and file it.

Should I choose a walk-in shower or keep a bathtub?

It depends on how the bathroom is used. A walk-in shower suits primary suites and anyone who wants easier access, and it often makes a small bathroom feel larger. Keeping a tub makes sense in a hall bathroom used by young children, and many buyers with families look for at least one tub in the house. We compare both layouts in your CAD designs. Read more in Bathtub vs. Walk-In Shower.

Are curbless showers practical in Los Angeles homes?

Yes, with the right construction. A curbless shower needs the subfloor recessed or a sloped structural pan so water drains without a curb, a linear or properly placed drain, and waterproofing that extends beyond the shower area. They are easier to clean and easier to use at any age. See Curbless Shower Pros and Cons.

What problems do you find when remodeling older LA bathrooms?

The most common are asbestos or lead paint in homes built before 1980, mold behind original tile, rotted subfloor from slow leaks, aging cast-iron or galvanized pipes, and missing or undersized exhaust fans. We check for the likely ones at the site visit and price them into your proposal, and if something new appears behind a wall, we show you the options and costs before proceeding.

Can you make a bathroom safer for an older family member?

Yes. Common upgrades are a curbless or low-threshold shower, wall blocking for grab bars by the shower and toilet, a comfort-height toilet, slip-resistant tile, a handheld shower and a built-in bench, lever handles, and brighter, shadow-free lighting. We plan these with you and your family member so the room works for them now and later.

Can I buy my own tile and fixtures?

Yes. Some clients buy their own tile, tub, faucets and vanity while we handle demolition, waterproofing, tile setting, installation and finish work. We confirm quantities, dimensions and lead times before you order so everything fits and arrives on schedule.

Is $10,000 enough to remodel a bathroom in Los Angeles?

For a cosmetic refresh, yes. $5,000–$12,000 covers a new vanity, toilet, faucets, lighting, mirrors and paint when the toilet, shower and drain stay where they are and the tile shower is not rebuilt. Once the shower comes out and is rebuilt with new waterproofing and tile, most Los Angeles bathrooms move into the $18,000–$35,000 mid-range tier. A $5,000 budget usually covers one or two upgrades, such as a new vanity and toilet, rather than a full remodel.

What is the 30% rule in remodeling?

It is a rule of thumb that total renovation spending should stay under about 30% of the home’s current value, so you don’t put in more than the neighborhood will pay back when you sell. A single bathroom is a much smaller share: a $18,000–$35,000 mid-range remodel is a small fraction of a typical Los Angeles home’s value. Use the rule as a check against over-improving, not as a budget. The scope you need and the finishes you choose should set the number.

What are common mistakes to avoid when renovating a bathroom?

The ones we see most: skipping permits, which surfaces when you sell; deciding to move plumbing after demolition has started; reusing an undersized or unducted exhaust fan, which leads to mold; cutting corners on shower waterproofing; ordering custom vanities, tile and glass late, which stalls the job; choosing floor tile that is slippery when wet; and leaving no contingency for what demolition uncovers in an older home. Our design and proposal steps are set up to settle each of these before work starts.

Is adding a bathroom to a house worth it?

In many Los Angeles homes, yes, especially when a house has fewer bathrooms than bedrooms or only one full bath. An added bathroom makes daily routines easier and is a feature buyers look for. Cost depends mostly on location: converting existing space close to current plumbing costs far less than building an addition, and the distance to the main sewer line matters. Adding a bathroom requires plan check with LADBS or your city. It can also be planned into a garage conversion or an ADU.

Are the three CAD designs really free?

Yes. Your first three professional CAD design concepts are free, whether or not you move forward right away. They are preliminary concepts, not permit-ready drawings; if your project needs permit drawings or structural engineering, we explain the scope and any fees in writing first.

View all remodeling FAQs

Infographic: top 6 design trends in Los Angeles bathrooms in 2026
Top 6 design trends in Los Angeles bathrooms in 2026
Areas we serve

Bathroom Remodeling Across Los Angeles

We remodel bathrooms in 23 Los Angeles communities. Your address decides which building department issues the permit, so the list is grouped by permitting authority.

City of Los Angeles neighborhoods

Permits through LADBS (Los Angeles Department of Building and Safety)

  • Bel-Air
  • Brentwood
  • Encino
  • Los Feliz
  • Pacific Palisades
  • Playa Vista
  • Sherman Oaks
  • Silver Lake
  • Studio City
  • Westwood
  • Woodland Hills

Separate cities

Permits through each city's own building department

  • Beverly Hills
  • Calabasas
  • Culver City
  • Malibu
  • Manhattan Beach
  • Palos Verdes Estates
  • Pasadena
  • San Marino
  • Santa Monica
  • West Hollywood

LA County

Permits through LA County Building and Safety

  • Altadena
  • Rolling Hills
Get started

Ready to Start Your Bathroom Remodeling Project?

Book a free site visit. We measure your bathroom, talk through your goals and budget, explain what your project needs for design, permits and construction, and prepare three CAD layouts.

Page reviewed by Tony Akopyan, Construction & Remodeling Specialist. Last updated November 2026.

Precise Building and Restoration

Scroll to Top